South El Monte, CA
Roof replacement in South El Monte
A re-roof is the second-largest cheque most homeowners write on their house, and the one they have the least information about.
Describe the replacement job
Three questions, then the address. Up to three South El Monte contractors who do this work.
You are on the list.
No provider in South El Monte is taking requests through this service yet. We are lining them up, and yours is kept until one can.
- Nobody gets your details yet. Your request stays with us and is not passed to any company.
- One email when someone can help. When a provider covering your area can take it on, we email you once and ask whether you want that company, by name, to contact you.
- Deleted after 90 days. If nobody can take it on, or you do not say yes, your contact details are deleted 90 days after your request.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
Nobody will call you about this request unless you say yes to a company by name.
Before you let anybody on the roof
The things worth pinning down on a replacement job. A contractor who has not raised them has not looked properly.
- Who pulls the permit, and what the inspection schedule looks like
- A written per-sheet price for replacing bad decking
- Tear-off or overlay, and what the local code allows
- Which underlayment, and whether ice-and-water goes on the eaves and valleys
- How the site is protected, and who cleans up the nails
A proper replacement is a tear-off, not an overlay. Going over the top of the old roof saves money on day one and costs it back at the next replacement, when there are two layers to remove and no way to inspect the deck.
Two quotes at the same price can be very different roofs. Compare the layers, not the brand name on the shingle.
Ask how long the crew has been together. Roofing is a trade where the same company name can mean an entirely different set of hands from one season to the next.
Locally
Close behind that: shaded slopes that never really dry out. It is why two identical houses on the same street can be ten years apart on the same roof, depending on which way they face.
About replacement here
What time of year is best to re-roof in South El Monte?
Practically, the long dry run from May to October. Crews are busiest right after the weather turns — November through March — so booking outside that stretch usually buys you a better date and a keener number.
I have solar panels. What happens to them?
They come off and go back on, and that is a separate cost, often handled by the solar installer rather than the roofer. If the roof is near the end of its life, do the roof first — removing and refitting panels twice is money wasted.
Should I repair or replace?
Rough rule: if the covering has more than about five years left and the damage is confined to one area, repair. If it is at the end of its life or you are patching the third leak in two years, you are paying instalments on a replacement.
Why does ventilation keep coming up?
Because a badly ventilated attic cooks the roof from underneath and takes years off it. Intake at the eaves and exhaust at the ridge, in balance. It is cheap during a re-roof and awkward afterwards.
Get the roof looked at
Free, no obligation, and your details go to no company until you say yes.
